Looks like I missed a request.
Here is a picture of the locker looking in the cockpit locker. It hold 2 11 pounders. It is mounted on a platform that hinges to allow the locker to lay down so I can remove the top and access the cylinders. The deck plate gives me access to the valve for the inboard cylinder. There is the usual solenoid for the hoses and vapor sniffer and alarm. There is a vent at the bottom, that was molded in. It goes to a thru hull above the water line. The PO installed this locker. I added the deck plate.
Here is a picture of the locker looking in the cockpit locker. It hold 2 11 pounders. It is mounted on a platform that hinges to allow the locker to lay down so I can remove the top and access the cylinders. The deck plate gives me access to the valve for the inboard cylinder. There is the usual solenoid for the hoses and vapor sniffer and alarm. There is a vent at the bottom, that was molded in. It goes to a thru hull above the water line. The PO installed this locker. I added the deck plate.
Comment