Quick update as I was detoured into winterizing by early storm...
Regret delayed update....we had a storm in October that generated a lot more snow than expected and jump started my winterization plan. First time I have built a frame and structure in support of winter work on the boat..
Exhaust update.
I was able to get a couple of turns on the nipple at the flange and the connector at the water injection fitting. Initial results are positive. i still need to give the engine a good running session to see if I have solved the leaks. I have not wrapped anything yet.
Bought this used small and narrow pipe wrench that is actually matte dark military green metal and has the best gripping teeth I could hope for. It is the sole reason I was able to get a couple of turns on the nipple and connector.
I am hoping weather will permit another long engine run so I can wrap up the exhaust system journey before final winterization. Thankful for all the help here. Will post again on final test. Stay well. Happy Thanksgiving.
__________________
Tim Smith
Oasis
Pearson 30
1974, Number 572
Boston, MA USA
|